Crawford Lehigh Storehorse Leslie-Locke M&K Ultra-Hold
home

close out buys
what's new
products
retailer locator
how to projects
about The Lehigh Group
retailers only
become a retailer
other links
contact
consumer
employees
consumer

Join our e-mail list and get the latest information on new products, learn how-to tips and link to new features in our website.

Name:
Email:


The Lehigh Group
2834 Schoeneck Road
Macungie, PA 18062
Tel: (610) 966-9702
Fax: (610) 966-3246


Leslie-Locke
675 W. Manville Street
Compton, CA 90220
Tel: (800) 755-9520
Fax: (310) 638-1829

In Canada:

Royal International Corporation
Montreal, QC H4T1T9
Tel: (514) 735-4566
 
Related Information:
Which is the best rope for the job? See rope properties.
What is the safe working load of my rope? See safe working loads.
Can the elements affect my rope? See proper use and care of rope.
What is the proper technique for knotting rope? See knotting techniques.

See Also:
Instructions for end splice.

INSTRUCTIONS FOR CREATING AN EYE SPLICE
eye splice step 1STEP 1
Singe end of rope over match flame to prevent unravelling.
eye splice step 2STEP 2
Take singed end of rope and insert into fid. Determine the size of the eye and take 6" more rope. Insert fid through rope at this point.
eye splice step 3STEP 3
Insert fid between sections of rope. Fid with rope can be easily passed up center of primary rope.
eye splice step 4STEP 4
When eye is proper size, remove fid through rope leaving secondary end completely covered. Spliced section should be at least 6" in length.
eye splice step 5STEP 5
Draw hand over splice to smooth and tighten splice.

To make splice permanent, return fid to end of rope and place back through rope slightly below original exit point.
completed eye spliceYour eye splice is now complete!



HOME | CLOSE OUT OFFERS | WHAT'S NEW | PRODUCTS | RETAILER LOCATOR
HOW-TO PROJECTS | ABOUT THE LEHIGH GROUP | RETAILERS ONLY
BECOME A RETAILER | LINKS | CONTACT US | CONSUMER CENTER
EMPLOYEE ACCESS